<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>members</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/var/www/html/ati-wp/wp-includes/functions.php</b> on line <b>6131</b><br />
{"id":251,"date":"2021-04-30T10:11:11","date_gmt":"2021-04-30T15:11:11","guid":{"rendered":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/?page_id=251"},"modified":"2021-08-06T13:45:33","modified_gmt":"2021-08-06T18:45:33","slug":"success-stories","status":"publish","type":"page","link":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/success-stories\/","title":{"rendered":"Success Stories"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">At ATI, we are committed to achieving ACES<sup>2<\/sup> Mobility for the residents of Alabama: <strong>mobility that is automated, connected, electric, shared and safe<\/strong>. We have achieved several success stories in these areas since our founding in 2017.<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Alabama Legislative Support<\/h3>\n\n\n\n<p class=\"success-description\">ATI has supported legislative leaders and the Governor&#8217;s office in Alabama on efforts that led to the Rebuild Alabama (Transportation Infrastructure) legislative package being enacted. This package is expected to generate about $320 Million annually for the state to invest in roads and bridges across the estate, and the Port of Mobile. This is the first time in 27 years that the state has been able to raise the revenue streams for transportation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Traffic Management Center<\/h3>\n\n\n\n<p class=\"success-description\">Partnered with ALDOT to establish the West Central Region Traffic Management Center on UA\u2019s campus, co-located with ATI. This command and control center, which has a state-of-the-art network of cameras and data sensors, allows ALDOT employees and UA researchers to monitor traffic in a 13-county region in west central Alabama improving travel time reliability and enhancing road user safety.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Decatur Infrastructure Funding Assistance<\/h3>\n\n\n\n<p class=\"success-description\">Assisted the City of Decatur, AL to develop a successful application to the USDOT for $14.2 million in federal funding for a road and bridge construction project with an additional $4 million from ALDOT.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Student Engagement<\/h3>\n\n\n\n<p class=\"success-description\">Facilitated student engagement in major high profile national and international transportation engineering competitions. This includes participation in the first three years of the EcoCAR Mobility Challenge (sponsored by the US Department of Energy), with a first-place grand prize victory in 2021. This also includes participation in the first Indy Autonomous Challenge (Fall 2021) as a partner with The University of Milan.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">ACTION Grant<\/h3>\n\n\n\n<p class=\"success-description\">ATI is leading a multi-faceted project, called the Advanced Connected Transportation Infrastructure &amp; Operations Network, or ACTION. The project represents an $8 million award from the USDOT and an additional $8.3 million from various partners in Alabama, totaling $16.3 million. ACTION\u2019s core theme is to leverage technological advances to enhance efficiency, capacity, and safety. Key components of ACTION include a network of sensors and cameras, communications technologies, and traffic signal systems, as well as mobility tools for passenger and freight traffic. The project will substantially mitigate congestion, improve travel time reliability, and enhance safety for motorists, pedestrians and in the region, all of which are critical for the region\u2019s economic vitality and interstate commerce.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Tuscaloosa INFRA Grant<\/h3>\n\n\n\n<p class=\"success-description\">ATI coordinated efforts with various stakeholders including, but not limited to, the City of Tuscaloosa, ALDOT, and DCH Regional Medical Center to secure $6.87 million in federal funding for the construction of a new University Blvd. bridge over McFarland Blvd. The new bridge will lengthen and widen the overpass to create greater efficiency and safety, providing more access to education, healthcare, and business\/employment opportunities.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Mobile I-10 Bridge Report<\/h3>\n\n\n\n<p class=\"success-description\">Commissioned by ALDOT, ATI produced at report seeking to determine the economic benefits to building the Mobile River Bridge, as well as the lost economic benefits if the project were not built. The report quantified at a broad macroscopic level the costs associated with the status quo (i.e., the proposed Mobile River Bridge Project is not built, or the \u201cNo-Build\u201d scenario) and presented findings about key economic and safety benefits associated with the \u201cBuild\u201d scenario.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Wiregrass SR-167 Report<\/h3>\n\n\n\n<p class=\"success-description\">To address projected traffic congestion and safety and other future concerns, including disaster evacuations, Wiregrass Economic Development Corporation (WEDC) is proposing the widening of SR-167 from 2-lanes to 4-lanes on the section of the highway in Coffee, Dale, and Geneva Counties between the Alabama\/Florida state line and SR-167&#8217;s intersection with US-84 in Enterprise. WEDC seeks to determine the economic benefits to expanding SR-167, as well as the lost economic benefits if the project were not built. This report quantifies at a broad macroscopic level the costs associated with the status quo (i.e., the proposed widening is not built, or the \u201cNo-Build\u201d scenario) and presents findings about key economic and safety benefits associated with the proposed SR-167 expansion (i.e., the proposal project is built, or the \u201cBuild\u201d scenario). It considers current and projected travel demand, traffic delay and environmental costs. In addition, this report presents evacuation benefits under hurricane emergencies for the population of Bay, Washington, and Holmes counties in Florida, and Geneva County in Alabama.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Alabama Mobility and Power (AMP) Initiative<\/h3>\n\n\n\n<p class=\"success-description\">This new initiative promises to be transformative for ATI and for The University of Alabama. AMP will provide a platform for ATI and UA to establish leadership in transportation electrification, which will be a pivotal concept in transportation over the next decade.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">$15M BUILD Grant<\/h3>\n\n\n\n<p class=\"success-description\">ATI was instrumental in Obtaining a $15M BUILD Grant for Tuscaloosa and has continued to serve as a go-to organization for state and local agencies in Alabama who need assistance with transportation projects. In this area, we were successful in helping Tuscaloosa obtain a $15M BUILD grant to support a portion of the Riverwalk project, along with the Saban Center and some bridge improvements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">State of Alabama Public Safety IT Infrastructure<\/h3>\n\n\n\n<p class=\"success-description\">We have provided a major portion of the State of Alabama public safety and traffic safety information technology infrastructure, including provision of applications for electronic traffic citations, electronic crash reporting, crime reporting, DUI reporting, commercial vehicle inspections, registration and titling, ambulance run reporting, and driver lookup applications.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">ATI Strategic Plan 2020-2024<\/h3>\n\n\n\n<p>ATI completed and released a Strategic Plan for 2020-2024 that is foundational to our structure and future growth. This plan defines a mission, research themes and strategic pillars for the organization, and is already being used to guide the organization in its mission going forward.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At ATI, we are committed to achieving ACES2 Mobility for the residents of Alabama: mobility that is automated, connected, electric, shared and safe. We have achieved several success stories in these areas since our founding [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-251","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/pages\/251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/comments?post=251"}],"version-history":[{"count":17,"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/pages\/251\/revisions"}],"predecessor-version":[{"id":1881,"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/pages\/251\/revisions\/1881"}],"wp:attachment":[{"href":"https:\/\/web01-staging.caps.ua.edu\/ati-wp\/wp-json\/wp\/v2\/media?parent=251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}